Contract 2025-004ADocusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
AGREEMENT No. 2025-004
CONSTRUCTION OF TWO (2) CEMETERY COLUMBARIA AND TWO (2) GRANITE
BENCHES
THIS AGREEMENT, is made and entered into this Tuesday, January 28, 2025, by and between
the CITY OF CLERMONT, FLORIDA, a municipal corporation under the laws of the State of
Florida whose address is: 685 W. Montrose Street, Clermont, Florida, (hereinafter referred to as
"CITY"), and AGG RESTORATION OF SOUTHWEST FLORIDA LLC, whose address is: 7704
18th Ave. NW, Bradenton, Florida 34209, (hereinafter referred to as "CONTRACTOR").
WITNESSETH: That the parties hereto, for the consideration hereinafter set forth, mutually agree
as follows:
1. SCOPE OF WORK
The CONTRACTOR shall furnish all labor, materials, equipment, machinery, tools, apparatus,
and transportation and perform all of the work described in the specifications entitled:
RFB 25-044 titled Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches,
as prepared by the CITY and its agents and shall do everything required by this Contract and the
other Contract Documents contained in the specifications, which are a part of these Documents.
2. THE CONTRACT SUM
The CITY shall pay to the CONTRACTOR, for the faithful performance of the Contract, in lawful
tender of the United States, and subject to addition and deductions as provided in the Contract
Documents, the Price Schedule, attached hereto and incorporated herein as Exhibit "A". The total
contract sum shall not exceed THIRTY-SEVEN THOUSAND EIGHT HUNDRED AND
FORTY-TWO DOLLARS ($37,842.00).
3. COMMENCEMENT AND COMPLETION OF WORK
A. The CONTRACTOR shall commence work within Ten (10) calendar days after receipt of
(i) Purchase Order and/or Notice to Proceed, and (ii) receipt of all permits required to
perform the work, and the CONTRACTOR will substantially complete the same within
225 days, unless the period for completion is extended otherwise by the CONTRACT
DOCUMENTS.
B. The CONTRACTOR shall prosecute the work with faithfulness and diligence.
C. The CONTRACTOR further declares to have examined the site of the work and that from
personal knowledge and experience or that CONTRACTOR has made sufficient
investigations to fully satisfy that such site is correct and suitable for the work and
CONTRACTOR assumes full responsibility therefore. The provisions of this Contract
1
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
shall control any inconsistent provisions contained in the specifications. All Drawings
and Specifications have been read and carefully considered by the CONTRACTOR, who
understands the same and agrees to their sufficiency for the work to be done. It is
expressly agreed that under no circumstances, conditions or situations shall this Contract
be more strongly construed against the OWNER than against the CONTRACTOR and
his Surety.
4. LIQUIDATED DAMAGES
A. It is mutually agreed that time is of the essence in regard to this Contract. Therefore,
notwithstanding any other provision contained in the Contract Documents, should the
CONTRACTOR fail to complete the work within the specified time as set by the
Purchase Order and/or Notice to Proceed, or any authorized extension thereof, the
CONTRACTOR shall pay to CITY the sum of ONE HUNDRED DOLLARS ($100) per
calendar day as fixed, agreed and liquidated damages for each calendar day elapsing
beyond the specified time date; which sum shall represent the damages sustained by the
CITY, and shall be considered not as a penalty, but in the liquidation of damages
sustained. CONTRACTOR shall pay the liquidated damages amount contained herein to
CITY within fifteen (15) days of receipt of CITY's written demand for such payment.
B. For the purposes of this Article, the day of final acceptance of the work shall be
considered a day of delay, and the scheduled day of completion of the work shall be
considered a day schedule for protection.
5. PAYMENTS
In accordance with the provisions fully set forth in the Contract Documents, CONTRACTOR shall
submit an invoice to CITY upon completion of the services and delivery of products to CITY as
set forth in the applicable purchase order. CITY shall make payment to the CONTRACTOR for
all accepted deliveries and undisputed products delivered and services provided, within thirty (30)
calendar days of receipt of the invoice.
6. DISPUTE RESOLUTION - MEDIATION
A. Any claim, dispute or other matter in question arising out of or related to this Agreement
shall be subject to mediation as a condition precedent to voluntary arbitration or the
institution of legal or equitable proceedings by either party.
B. The CITY and CONTRACTOR shall endeavor to resolve claims, disputes and other
matters in question between them by mediation.
C. The parties shall share the mediator's fee and any filing fees equally. The mediation shall
be held in Clermont, Lake County, Florida, unless another location is mutually agreed
2
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
upon. Agreements reached in mediation shall be enforceable as settlement Agreements in
any court having jurisdiction thereof.
7. INSURANCE AND INDEMNIFICATION RIDER
7.1. Worker's Compensation Insurance
The CONTRACTOR shall take out and maintain during the life of this Agreement, Worker's
Compensation Insurance for all its employees connected with the work of this Project and, in case
any work is sublet, the CONTRACTOR shall require the subCONTRACTOR similarly to provide
Worker's Compensation Insurance for all of the subCONTRACTOR employees unless such
employees are covered by the protection afforded by the CONTRACTOR. Such insurance shall
comply with the Florida Worker's Compensation Law. In case any class of employees engaged in
hazardous work under this Agreement at the site of the Project is not protected under the Worker's
Compensation statute, the CONTRACTOR shall provide adequate insurance, satisfactory to the
CITY, for the protection of employees not otherwise protected.
7.2. CONTRACTOR's Commercial General Liability Insurance
The CONTRACTOR shall take out and maintain during the life of this Agreement, Commercial
General Liability and Business Automobile Liability Insurance as shall protect it from claims for
damage for personal injury, including accidental death, as well as claims for property damages
which may arise from operating under this Agreement whether such operations are by itself or by
anyone directly or indirectly employed by it, and the amount of such insurance shall be as follows:
A. CONTRACTOR's Commercial General Liability, $500,000 Each, ($1,000,000
aggregate). Liability Coverages, Bodily Injury Occurrence, & Property Damage
Combined Single Limit
B. Automobile Liability Coverages, $500,000 Each, Bodily Injury & Property Damage
Occurrence, Combined Single Limit
The insurance clause for both BODILY INJURY AND PROPERTY DAMAGE shall be amended
to provide coverage on an occurrence basis.
7.3. SubCONTRACTOR's Public Liability and Property Damage Insurance
The CONTRACTOR shall require each of his subCONTRACTORs to procure and maintain
during the life of this subcontract, insurance of the type specified above or insure the activities of
his subCONTRACTORs in his policy, as specified above.
7.4. CITY's and CONTRACTOR's Protective Liability Insurance
The CITY shall procure and furnish a CITY's and CONTRACTOR's Protective Liability
Insurance Policy with the following minimum limits:
A. Bodily Injury Liability & $1,000,000 Each ($2,000,000 aggregate) Property Damage
Liability Occurrence Combined Single Limit.
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
7.5. "XCU" (Explosion, Collapse, Underground Damage)
The CONTRACTOR's Liability Policy shall provide "XCU" coverage for those classifications in
which they are excluded.
7.6. Broad Form Property Damage Coverage, Products & Completed Operations Coverages
The CONTRACTOR's Liability Policy shall include Broad Form Property Damage Coverage,
Products, and Completed Operations Coverages.
7.7. Indemnification Rider
A. To the fullest extent permitted by law, both parties shall indemnify and hold harmless the
other party and its employees from and against all claims, damages, losses and expenses,
including but not limited to reasonable attorney's fees, arising out of or resulting from this
Agreement, provided that any such claim, damage, loss or expense (1) is attributable to
bodily injury, sickness, disease or death, or to injury to or destruction of tangible property
(other than the Work itself) , and (2) is caused in whole or in part by any negligent act or
omission of either party, or anyone directly or indirectly employed by either party or
anyone for whose acts either party may be liable, regardless of whether or not such acts
are caused in part by a party indemnified hereunder. Such obligation shall not be
construed to negate, abridge, or otherwise reduce any other right to obligation of
indemnity which would otherwise exist as to any party or person described in this Article;
however, this indemnification does not include the sole acts of negligence, damage or
losses caused by the CITY and its other contractors.
B. In any and all claims against the CITY or any of its agents or employees by any
employee of the CONTRACTOR, any subcontractor, anyone directly or indirectly
employed by any of them or anyone for whose acts any of them may be liable, the
indemnification obligations under this Paragraph shall not be limited in any way by any
limitation on the amount or type of damages, compensation or benefits payable by or for
the CONTRACTOR or any subcontractor under workers' or workmen's compensation
acts, disability benefit acts or other employee benefit acts.
C. The CONTRACTOR hereby acknowledges receipt of ten dollars and other good and
valuable consideration from the CITY for the indemnification provided herein.
8. NOTICES
All notices shall be in writing and sent by United States mail, certified or registered, with return
receipt requested and postage prepaid, or by nationally recognized overnight courier service to the
address of the party set forth below. Any such notice shall be deemed given when received by the
party to whom it is intended.
4
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
CONTRACTOR:
AGG Restoration of Southwest Florida LLC
7704 18th Ave. NW, Bradenton, Florida 34209
Attn: Clifford Ullmann
OWNER:
City of Clermont
685 W. Montrose Street, Clermont, FL 34711
Attn: Rick Van Wagner, Interim City Manager
Either party may change the name of the person receiving notices and the address at which notices
are received by so advising the other party in writing.
9. MISCELLANEOUS
9.1. Attorneys' Fees
In the event a suit or action is instituted to enforce or interpret any provision of this Agreement,
the prevailing party shall be entitled to recover such sum as the Court may adjudge reasonable as
attorneys' fees at trial or on any appeal, in addition to all other sums provided by law.
9.2. Waiver
The waiver by CITY of breach of any provision of this Agreement shall not be construed or operate
as a waiver of any subsequent breach of such provision or of such provision itself and shall in no
way affect the enforcement of any other provisions of this Agreement.
9.3. Severability
If any provision of this Agreement or the application thereof to any person or circumstance is to
any extent invalid or unenforceable, such provision, or part thereof, shall be deleted or modified
in such a manner as to make the Agreement valid and enforceable under applicable law, the
remainder of this Agreement and the application of such a provision to other persons or
circumstances shall be unaffected, and this Agreement shall be valid and enforceable to the fullest
extent permitted by applicable law.
9.4. Amendment
Except for as otherwise provided herein, this Agreement may not be modified or amended except
by an Agreement in writing signed by both parties.
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
9.5. Entire Agreement
This Agreement, including the documents incorporated by reference, contains the entire
understanding of the parties hereto and supersedes all prior and contemporaneous Agreements
between the parties with respect to the performance of services by CONTRACTOR.
9.6. Assi _ ng ment
Except in the event of a merger, consolidation, or other change of control pursuant to the sale of
all or substantially all of either party's assets, this Agreement is personal to the parties hereto and
may not be assigned by CONTRACTOR, in whole or in part, without the prior written consent of
the CITY.
9.7. Venue
The parties agree that the sole and exclusive venue for any cause of action arising out of this
Agreement shall be Lake County, Florida.
9.8. Applicable Law
This Agreement and any amendments hereto are executed and delivered in the State of Florida and
shall be governed, interpreted, construed, and enforced in accordance with the laws of the State of
Florida.
9.9. Public Records
The CONTRACTOR expressly understands records associated with this project are public records
and agrees to comply with Florida's Public Records law, including the following:
A. Keep and maintain public records that ordinarily and necessarily would be required by
the CITY in order to perform the services contemplated herein.
B. Provide the public with access to public records on the same terms and conditions that the
CITY would provide the records and at a cost that does not exceed the cost provided in
Florida's Public Records law or as otherwise provided by law.
C. Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law.
D. Meet all requirements for retaining public records and transfer, at no cost, to the CITY all
public records in possession of CONTRACTOR upon the termination of the contract and
destroy any duplicate public records that are exempt or confidential and exempt from
public records disclosure requirements. The CONTRACTOR shall make reasonable
efforts to provide all records stored electronically to the CITY in a format compatible
with the information technology systems of the CITY.
E. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF
CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO
PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, THE
11
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
CONTRACTOR SHALL CONTACT THE CITY'S CUSTODIAN OF PUBLIC
RECORDS AT THE CITY CLERK'S OFFICE, (352) 241-7331.
10. CONTRACT DOCUMENTS
The Contract Documents, as listed below are herein made fully a part of this Contract as if herein
repeated.
Document Precedence:
A. Contract Agreement
B. Purchase Order / Notice To Proceed
C. An applicable Contractor Quote or Statement of Work
D. All documents contained in RFB 25-044 titled Construction of Two (2) Cemetery
Columbaria and Two (2) Granite Benches and CONTRACTOR's response thereto.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement.
7
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
IN WITNESS WHEREOF, the parties hereto have executed this Agreement.
CITY OF CLERMONT
Signed by:
Uaan (Wfn.t,V'
SIGNATURE
Rick Van Wagner
ATTEST
FTDocuSig ned by:
ay A d li4wc
SIWXWff aan...
Tracy Ackroyd Howe
FULL NAME FULL NAME
Interim City Manager City Clerk
TITLE TITLE
2/3/2025 �/9 2025
DATE SIGNED
91
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
Standard Agreement
RFB 25-044 Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
AGG RESTORATION OF SOUTHWEST FLORIDA LLC
Signed by:
Ul�bVta C�U,V'b
SI 9P 12CI85E3411...
Victoria Quero
FULL NAME
MS
TITLE
1/29/2025
DATE SIGNED
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
[AGG RESTORATION OF SOUTHWEST FLORIDA LLC] RESPONSE DOCUMENT REPORT
RFB No. RFB 25-044
Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
If this does not apply, type "N/A"
N/A
CONFLICTS OF INTEREST*
The following relationships are the only potential, actual, or perceived conflicts of interest in connection with this proposal.
If none, type "N/A"
N/A
SUPPLEMENTAL QUESTIONNAIRE*
The respondent understands that information contained in this form will be relied upon by the City in making an award
recommendation and such information is warranted by the respondent to be true. The undersigned respondent agrees to furnish
such additional information, prior to award recommendation. The respondent further understands that the information contained in
this form may be confirmed through a background investigation conducted by the City of Clermont Police Department. By submitting
this questionnaire the respondent agrees to cooperate with this investigation, including but not necessarily limited to fingerprinting
and providing information for credit check.
Confirmed
PRICE TABLES
[AGG RESTORATION OF SOUTHWEST FLORIDA LLC] RESPONSE DOCUMENT REPORT
Request For Bid - Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
Page 10
Docusign Envelope ID: 5C265ECF-9D4B-4256-8BFC-EA2845FD3CD4
Request For Bid #RFB 25-044
Title: Construction of Two (2) Cemetery Columbaria and Two (2) Granite Benches
3. Scope of Work
3.1. Statement of Work
The City of Clermont is accepting bids to furnish and install two (2) new cemetery columbaria
and two (2) new granite benches. Respondents must furnish all labor, materials, parts, and
equipment necessary to construct two new cemetery columbaria at Oak Hill Cemetery. The
cemetery is located at 801 East Avenue, Clermont, Florida. All materials must be of high quality
required to complete the work described herein and to clean up after the work is done. A
diagram of the columbaria and related pictures are provided in Section 7 - Attachments.
The successful respondent must provide the following:
A. Furnish and install two (2) new preassembled double -sided columbaria with twenty-four
(24) niches per side, for a total of forty-eight (48) niche spaces per columbarium (see
diagram in section 7).
B. The columbarium must have gray granite for the interior and exterior.
C. The columbarium exterior must be polished gray granite with a pitched roof and a 4-inch
thick granite floor.
D. Columbarium niche size must be 12in. x 12in. x 12in. Twenty-four (24) niches per side.
E. Individual columbarium niche doors must be made of black granite.
F. The unit must be sealed to a concrete base that is formed and poured by the City and it
is to match the existing columbaria in the area.
G. Base Measurements: Base must be gray granite 7ft.-4in. x 3ft.-4in. x 8in. thick, sawed
top with rock sides.
H. The new columbarium must match the existing columbaria in the area.
I. Furnish and install two (2) polished granite benches, color gray.
J. Bench Measurements:
1. Top Seat: 48-inches long by 14-inches wide by 4-inches thick.
2. Uprights: 14-inches tall by 13-inches wide by 4-inches thick.
3. Base: 37-inches long by 14-inches wide by 4-inches thick.
K. The new bench must match the existing benches in the area.
L. The successful respondent must furnish all labor, materials, parts and equipment
necessary to complete the installation and must remove all trash and materials after
completion.
14