HomeMy WebLinkAboutContract 2019-87 A CO2019-87 / 20231454 RFQ 19-043 4 Aug 4, 2025 Engineering Svcs. WRF Expansion Public Services 3335 Hancock Road Tetra Tech, Inc. 201 East Pine Street, Suite 10000 Orlando, FL 32801 Provide additional professional services of a qualified structural engineer to conduct a field investigation and make recommendations in memorandum format summarizing the findings related to current conditions, suggested repairs, and recoating. 2,161,265.00 11,685.00 0.5% 129,232.00 140,917.00 6.5% 2,302,182.00 Rev. 3-27-2025 CHANGE ORDER FORM Contract / P.O. Number: Change Order Number: Project Name: Job Location: Bid Number: Change Order Date: Department: Telephone: City, St., Zip: Contact Name: Address: Company Name: VENDOR INFORMATION: DESCRIPTION OF CHANGE: Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages if necessary). ITEM AMOUNT ORIGINAL CONTRACT VALUE: AMOUNT OF THIS CHANGE ORDER: PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): AMOUNT OF PREVIOUS CHANGE ORDERS: TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum NEW CONTRACT VALUE (A+E) Must be within the overall scope of services in accordance with contract specifications. A. B. C. D. E. F. G. $ % $ $ % $ $ This Change Order is not valid without the following signatures: CONTRACTOR DEPARTMENT DIRECTOR PROJECT ARCHITECT / ENGINEER PROCUREMENT DIRECTOR / CITY MANAGER Council approval is required if change order(s): 1) exceeds 10% of the original contract amount for construction projects; 2) the funds are not available in the approved budget for the department. CITY OF CLERMONT ATTEST: Date Date DateDate DateDateMAYORCITY CLERK Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C 8/4/2025 8/5/2025 8/5/2025 BLK/Clermont EWRF Expansion/Additional CA Services Tt #200BP Gen/Clermont -1- 04/23/2025 SCOPE OF SERVICES CITY OF CLERMONT EASTERN WATER RECLAMATION FACILITY EXPANSION (ADDITIONAL SERVICES RELATED TO COATINGS FOR EXISTING STRUCTURES) I. PROJECT DESCRIPTION The Contractor for the Eastern Water Reclamation Facility Expansion anticipates that work will be completed to a point of substantial completion in July/August 2025. The City desires to engage a consultant familiar with structural conditions, concrete rehabilitation, and recoating to inspect the existing structures and make recommendations for repair, surface preparation and recoating. It is anticipated that most structures will be in good condition and that only minor repairs, such as crack injection will be necessary. Subsequent to the inspection work and preparation of recommendations, the City desires to have the current Contractor implement the recommendations under a change order to the current contract. In general, this scope includes: 1. A brief field investigation. 2. Preparation of a memorandum summarizing the findings from the field visit and recommended repair and coating work. 3. Administrative services such as price review and change order preparation. Services described herein will be performed in accordance with the City of Clermont, Florida and Tetra Tech, Inc. Agreement for Professional Engineer Services dated November 12, 2019. II. SCOPE OF SERVICES 1. Provide the services of a qualified structural engineer to conduct a field investigation and make recommendations in memorandum format summarizing the findings related to current conditions, suggested repairs, and recoating. This work effort assumes that the City will drain and clean the structures as required for inspection. 2. Prepare technical documentation for pricing by current project Contractor. 3. Review the Contractor’s proposed pricing and prepare an appropriate change order with supporting documentation. II. COMPENSATION SUMMARY The total compensation for the Scope of Services described in Section II is $11,685. Compensation will be based on lump sum basis. Attachment A presents a detailed breakdown of estimated manhours and associated compensation for the Scope of Services. Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C BLK/Clermont EWRF Expansion/Additional CA Services Tt #200BP Gen/Clermont -2- 04/23/2025 IV. SCHEDULE The initial evaluation, drawings, and specifications will be complete within four (4) weeks of the notice to proceed. The remain aspects of the assignment will be completed in response to the Contractor’s schedule. Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C Attachment A Proj Area > Submitted to: City of Clermont (Attn: Stoney Brunson) Contract Type: LUMP SUM Project Phases / Tasks 20 8 8 4 - 1.57%3,885 7,800 11,685 2 3 16 17 1. Field Evaluation/Recommendations (Wekiva)2 2 - 1.59%606 7,800 8,406 2. Review Wekiva Report/Prepare Price Request 6 2 4 - 1.59%1,002 1,002 3. Review Pricing Prepare CO 12 4 8 - 1.59%2,277 2,277 5. ODCs - - 1.59%- Totals 20 8 8 4 - 1.57%3,885 7,800 11,685 Task Pricing Totals Total Labor Hrs Subs Labor Rate Esc.LaborSr AdminRPREnvironmental EngineerWRF Expansion: Additional Construction Services Pricing by Resource Senior Environmental EngineerEWRF Expansion Price Proposal Tetra Tech - Confidential and Proprietary Page 1 of 1 Printed 4/23/2025 Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C