4 Aug 4, 2025
Engineering Svcs. WRF Expansion Public Services
3335 Hancock Road
Tetra Tech, Inc.
201 East Pine Street, Suite 10000 Orlando, FL 32801
Provide additional professional services of a qualified structural engineer to conduct a field investigation and make
recommendations in memorandum format summarizing the findings related to current conditions, suggested repairs,
and recoating.
2,161,265.00
11,685.00
0.5%
129,232.00
140,917.00
6.5%
2,302,182.00
Rev. 3-27-2025
CHANGE ORDER FORM
Contract / P.O. Number:
Change Order Number:
Project Name:
Job Location:
Bid Number:
Change Order Date:
Department:
Telephone:
City, St., Zip:
Contact Name:
Address:
Company Name:
VENDOR INFORMATION:
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
ITEM AMOUNT
ORIGINAL CONTRACT VALUE:
AMOUNT OF THIS CHANGE ORDER:
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
AMOUNT OF PREVIOUS CHANGE ORDERS:
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
NEW CONTRACT VALUE (A+E)
Must be within the overall scope of services in accordance with contract specifications.
A.
B.
C.
D.
E.
F.
G.
$
%
$
$
%
$
$
This Change Order is not valid without the following signatures:
CONTRACTOR
DEPARTMENT DIRECTOR
PROJECT ARCHITECT / ENGINEER
PROCUREMENT DIRECTOR /
CITY MANAGER
Council approval is required if change order(s): 1) exceeds 10% of the original contract amount for construction projects; 2) the
funds are not available in the approved budget for the department.
CITY OF CLERMONT ATTEST:
Date Date
DateDate
DateDateMAYORCITY CLERK
Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C
8/4/2025
8/5/2025 8/5/2025
BLK/Clermont EWRF Expansion/Additional CA Services
Tt #200BP Gen/Clermont -1- 04/23/2025
SCOPE OF SERVICES
CITY OF CLERMONT
EASTERN WATER RECLAMATION FACILITY EXPANSION
(ADDITIONAL SERVICES RELATED TO COATINGS FOR EXISTING STRUCTURES)
I. PROJECT DESCRIPTION
The Contractor for the Eastern Water Reclamation Facility Expansion anticipates that work will be
completed to a point of substantial completion in July/August 2025. The City desires to engage a
consultant familiar with structural conditions, concrete rehabilitation, and recoating to inspect the
existing structures and make recommendations for repair, surface preparation and recoating. It is
anticipated that most structures will be in good condition and that only minor repairs, such as
crack injection will be necessary. Subsequent to the inspection work and preparation of
recommendations, the City desires to have the current Contractor implement the
recommendations under a change order to the current contract. In general, this scope includes:
1. A brief field investigation.
2. Preparation of a memorandum summarizing the findings from the field visit and
recommended repair and coating work.
3. Administrative services such as price review and change order preparation.
Services described herein will be performed in accordance with the City of Clermont, Florida and
Tetra Tech, Inc. Agreement for Professional Engineer Services dated November 12, 2019.
II. SCOPE OF SERVICES
1. Provide the services of a qualified structural engineer to conduct a field investigation and
make recommendations in memorandum format summarizing the findings related to
current conditions, suggested repairs, and recoating. This work effort assumes that the
City will drain and clean the structures as required for inspection.
2. Prepare technical documentation for pricing by current project Contractor.
3. Review the Contractor’s proposed pricing and prepare an appropriate change order with
supporting documentation.
II. COMPENSATION SUMMARY
The total compensation for the Scope of Services described in Section II is $11,685. Compensation
will be based on lump sum basis. Attachment A presents a detailed breakdown of estimated
manhours and associated compensation for the Scope of Services.
Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C
BLK/Clermont EWRF Expansion/Additional CA Services
Tt #200BP Gen/Clermont -2- 04/23/2025
IV. SCHEDULE
The initial evaluation, drawings, and specifications will be complete within four (4) weeks of the notice to
proceed. The remain aspects of the assignment will be completed in response to the Contractor’s
schedule.
Docusign Envelope ID: 968746F8-76AD-4C20-A2D5-1755ADF2B13C
Attachment A
Proj Area >
Submitted to: City of Clermont (Attn: Stoney Brunson)
Contract Type: LUMP SUM
Project Phases / Tasks 20 8 8 4 - 1.57%3,885 7,800 11,685
2 3 16 17
1. Field Evaluation/Recommendations (Wekiva)2 2 - 1.59%606 7,800 8,406
2. Review Wekiva Report/Prepare Price Request 6 2 4 - 1.59%1,002 1,002
3. Review Pricing Prepare CO 12 4 8 - 1.59%2,277 2,277
5. ODCs - - 1.59%-
Totals 20 8 8 4 - 1.57%3,885 7,800 11,685
Task Pricing
Totals
Total
Labor Hrs Subs
Labor
Rate Esc.LaborSr AdminRPREnvironmental EngineerWRF Expansion: Additional Construction Services
Pricing by Resource
Senior Environmental EngineerEWRF Expansion
Price Proposal
Tetra Tech - Confidential and Proprietary Page 1 of 1 Printed 4/23/2025