HomeMy WebLinkAboutContract 2025-045 CODocusign Envelope ID: F4A15245-7795-43FC-ABOD-BODOACFE7859
CHANGE ORDER FORM
Contract / P.O. Number: 2025-045 / 20252190 Bid Number: RFB 25-067
Change Order Number: 1 Change Order Date: Aug 6, 2025
Project Name: East Ave. Sidewalk Construction Department: Public Services
Job Location: East Avenue
VENDOR INFORMATION:
Company Name: Estep Construction, Inc.
Address: 1144 Ocoee -Apopka Road City, St., Zip: Apopka, FL 32704
Contact Name: Jeffrey R. Estepp Telephone:(407) 325-5998
DESCRIPTION OF CHANGE:
Alteration, deviation, addition, or deletion caused by conditions encountered during construction not covered by the specifications and
drawings of the project (attach additional pages if necessary).
Additive Change Order to complete driveway slope adjustment on a resident's home located at 1452 East Avenue.
ITEM
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$ 168,955.50
B.
AMOUNT OF THIS CHANGE ORDER:
$ 5,700.00
Must be within the overall scope of services in accordance with contract specifications.
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A):
% 3.4%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$ 0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D):
$ 5,700.00
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 10% Maximum
% 3.4%
G.
NEW CONTRACT VALUE (A+E)
$ 174,655.50
This Change Order is not valid without the following signatures:
DocuSigned by:
CONTRACTOR
Signed by:
8/6/2025 �DU In, wbD� S
Date PROJECT ARCHITECT / ENGINEER
9/4/2025
Date
Signed by: D�ocuSSiigne"d� by:
9/8/2025 "�� d ak" S 9/8/2025
DEPARTMENT DIRECTOR Date PROCUREMENT DIRECTOR / Date
CITY MANAGER
Council approval is required if change order(s): 1) exceeds 10% of the original contract amount for construction projects; 2) the
funds are not available in the approved budget for the department.
CITY OF CLERMONT ATTEST:
MAYOR Date CITY CLERK Date
Rev. 3-27-2025