2008-25 SECTION 00681 CITY OF CLERMONT CONTRACT CHANGE ORDER CHANGE ORDER NO.: 1 DATE• January 04 2006 CONTRACTOR: WPC Industrial Contractors, Ltd. OWNER: CITY OF CLERMONT. FLORIDA AGREEMENT DATE: August Ol, 2005 The following changes are hereby made to the CONTRACT DOCUMENTS: Original CONTRACT PRICE $ 3,996,300 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $ 3,996,300 Net (Increase) Resulting from this CHANGE ORDER $ X956,198.021 The current CONTRACT PRICE including this CHANGE ORDER $ 3,040,101.98 ORIGINAL CONTRACT TIME: 308 days Date: Mav 25, 2006 Current CONTRACT TIME adjusted by previous CHANGE ORDERS* Date: May 25, 2006 Net (Increase} Resulting from this CHANGE ORDER Days: 0 Davs Current CONTRACT TIME Including this CHANGE ORDER Date: May 25, 2006 CHANGES ORDERED: AMO~T Direct Purchase: Owner purchase of major equipment to incur tax savings ($956,198.02) Total Contract Deduct ($956,148.02) I. GENERAL This Change Order is necessary to cover changes in the Work to be performed under this Contract. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all Work under this Change Order. II. REQUIRED CHANGES 1. Direct Purchase: Owner purchase of major equipment to incur tax savings III. JUSTIFICATION Value Engineering & change of preference IV. PAYMENT There will be no changes in the method of payment from the original contract. V. NARRATIVE OF NEGOTIATIONS Contract will be changed to reflect the items listed in the Letter dated January 04, 2006 from WPC Industrial Contractors, Ltd to Boyle Engineering Corporation (attached). This letter includes eight (8) items with a projected savings of $62,555.01. In addition, the original contract will be reduced by $95b,198.02 to account for the materials and equipment that will be purchased directly by the Owner. Further clarifications are listed below: Iteml, Sales Tax Savings: The Contractor will retain responsibility for receiving, storing, installing, and starting up the equipment and warranty services. 99-01'70.004 00681-1 The following items are described in the attached letter dated January 04, 2006 from the Contractor to Boyle Engineering Corporation. Item 1: Standby Engine Generator Item 2: Vertical Turbine Pumps Item 3: Variable Frequency Drives Item. 4: Fuel Oil System for Standby Emergency Power Item 5: Ductile Iron Pipe: Item 6: In-Line Static Mixers Item 7: Manual Check and Process Valves Item 8: Cans for Vertical Turbine Pumps VI. APPROVAL AND CHANGE AUTHORIZATION Clermont City Council Date Acknowledgments: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the orginal contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set faith or contemplated by this Change Order. ACCEPTED BY: CONTRACTOR WPC INDUS CONTRACTORS, LTD. By: •~, Signature Date: Title: Date: END OF SECTION Change Order Request by: Change(s) Ordered by: RECOMMENDED BY: CITY OF CLERMONT Tamara Richardson, P.E. By ...J~(f1'Yl C~AQ ~C I ~.~C~ ~. ig~n ~ e Date: ~~ ~ ~ Title: Director of Engineering and Utilities APPROVED BY: City of Clermont, Florida By. ~`~~~~-I l.Ic~rc~ ~~ .S. %rv'~ l1~c ~ H ~'~ ~ 99-0170.009 Tamara Richardson. P.E. Clemaont Cit-y Council Date: 00681-2 Attachment A Direct Purchase Agreement WPC Industxiai Contractors Ltd. Proposal for City of Clermont Owner Purchase Program The City of Clermont will direct purchase (with the assistance and at the direction of WPC Industrial Contractors, Ltd.} major equipment items in order to utilize their tax exempt status. The amount of sales tax saved (7% of the major equipment actual cost) will be enjoyed by the City of Clermont who will receive the 7% and WPC Industrial Contractors, Ltd. will retain their fee for costs to administer the Owner Purchase Program. The estimated major equipment actual cost is $893,643.01 resulting in an estimated savings to the City of $62,555.01. 99-0170.009 00681-3 N A] 'd 0 ~ V ~o ~ ~ a ~ `o N U c O U p 0 p p a v ° a d'' v N ~ ~ tt1 ~ F-' t~ cn o c~ O ~ ~ c+) d r„_ _ r ~ ~ ~ Q ~ U O p O p' p p N r ~ N o ~- G r ~ ~ 4. N d `~ ~ ~ d N = E d r ~ ~ O ~ N ~ ~" ~ R a W ^ M c 6 N ~ ~ i1- ot5 U M r- ~ O d p O ~ ~ LJ ~ r Q . ° a 0 ° ° • o, ° ~ n o ~ o '° ° `fr a 0 ~ a ~? p O 7 , C7 ~ ' t f )„ Q N ~ N ~ r ~ ~ o) N r- 4y} ~ ~ G ~ 6 fH C t- ~ ~ d' N ~ ~ ~ ~ ~ .~ ~ ~ ~'"` V a m ~ x a ~ F- U r o ...~ y z ' ~, 3 $ F c a d ~ o ~ ~ c ~ C~ v N ~ C] ~ `y LL N ~ c' N ~: p C] ~ M ~ ~ ` ~ t fi ~ T ~j ~ ~ ~ ~ ~ C ~ ~ ~ ~'"~ • ~ Z N ° ' o -~ a ~ ~ r ~ .S C CITY Or CLERMONT CHANGE ORDER NO. 2 DATE FILE NO. PROJECT NAME Sunburst Lane Water Treatment Plant CONTRACTOR WPC INDUSTRIAL CONTRACTORS, INC. NO. CONTRACT DATE 2rzsizoos CONTRACT FOR Sunburst Lane Water Treatment Plant TO; CONTRACTOR You are directed make the changes noted below in the subject contract: NATURE OF THE CHANGES: Changes are summarized in the attachments. EnclosedlAttached: Summary table and contractor's proposals. The changes result in the following adjustment of the Contract Price and Contract Time: Contract Price Prior to this Change Order: $3,040101.98 Net (Increase) (Decrease) Resulting from this Change Order: $ 16,461.00 Current Contract Price Including this Change Urder. $3,OS6,562.98 CHANGE ORDER 00930-1 FEC9820500 November 9, 2007 (Sunburst--Final-Changeorder {2) .doc) Change Order (pale two of two) Completion Prior to this Change Order: Completion Time Prior to this Change Order: Net (Increase) (Decrease) Resulting from this Change Order -Calendar Days: Completion Date Resulting from this Change Order: 9/29/2006 425 Davs 570 Davs 4/22/2008 The above changes are approved: ENGINEERING DEPARTMENT ~~~vr~Q-'~~hr.~.~~-- By: Tamara Richardson, PE Title City Engineer Date: Ate--- ~~~ ~ "ZX "~'~ - --. The above changes are accepted: CONTRACTOR -BUSINESS NAME WPC DUSTRIAL CONTRACTORS, LTD. By: Titl JONATHAN BELLOIT, PRESIDENT Date: N~vPmhPr A r ~ ~ ~ 7 The above changes are accepted: CITY OF CLERMONT ~-ktn~`f~l ~.~ny~ l/~ Date: C- ~ 2 ~ ~ ~" END OF SECTION CHANGE ORDER 00930-2 FEC9820500 November 9, 2007 (Sunburst-Final-Changeorder (2) .doc) 1 Change Order No. 2 List of Changes Item Description Price 1 Delete Fence Removal $ (6,000.00) 2 Delete Construction Photo Requirements $ (1,500.00) 3 Remove Hydro Tank $ 6,164.00 4 Delete Antenna for SCADA $ (4,000.00) 5 Delte Fire Hydrant Relocation $ (5,500.00) 6 Delete CL2 Pumps Retrofit $ (1,500.00) 7 Delete Tank Sidewalk $ (6,500.00) 8 Furnish & Install I & C Optical Isolators $ 11,697.00 10 Additional Site Layout Work Due to Survey $ 9,000.00 Issue 11 Materials Testing by Contractor $ 6,000.00 12 Furnish and Install Turtle Pens $ 7,600.00 13 Furnish & Install 100' of Addtional 24" $ 7,000.00 Tank Piping 14 Credit for SCADA Console $ (6,000.00) Total Change in Contract Price $ 16,461.00 Memo To: Wayne Saunders, City Manager From: Tamara Richardson, PE, City Engineer CC: Date: May 16, 2008 Re: Sunburst Lane Water Treatment Plant Change Orders 1 and 2 WPC Industrial Contractors, Inc. The Sunburst Lane Water Treatment Plant has been substantially complete since January 31, 2007. The original contract price was $3,996,300.00. The project generated two change orders. Change order no. 1 includes the reduction in contract price for the direct purchase items by the City. The items purchase directly totaled $956,198.02. The savings in sales taxes was $62, 555.01. Change order no. 2 includes a variety of changes to the project based on operational considerations, permitting requirements and construction related issues. The total change order is $16,461.00. The resulting contract price is $3,056,562.98. I am requesting approval of Change Orders Nos. 1 and 2 for WPC Industrial Contractors, Inc. for a combined prices of a credit of $939,737.02 and a new contract prices of $3,056,562.98.