2008-26CITY OF CLERMONT CHANGE ORDER NO. 03 DATE 05/08/08 FILE NO. PROJECT NAME East Side Water Reclamation Facilit~xpansion Phase 2 NO. CONTRACTOR Encore Construction Company CONTRACT DATE CONTRACT FOR Proiect TO: Encore Construction Company CONTRACTOR You are directed make the changes noted below in the subject contract: NATURE OF THE CHANGES: Refer to the attached summary of changes (Attachment A). Purpose of this Change Order: -6-07 Decrease the Contract Price to reflect cost reimbursement from the Contractor associated with the following project modifications: - Operations Building temperature control Elimination of the chlorine feed system to Clarifiers No.3 and No.4 Elimination of the table and piping associated with the deletion of the Chemical Feed Pump - Modifications to the piping to the generator day tank and associated monitoring well - Revise the Operations Building electrical loop conduits to 3/4-inch Revise the pressure gauges to be diaphragm type Revise the Operations Building sanitary pipe material Revise the UPS batteries to be lead acid Eliminate the slide gate structural modifications at the Chlorine Contact Tank - Modify the generator slab layout Y Eliminate the TVSSs in VFD circuits y Eliminate the below grade coating of the Ground Storage Tank Reduce the width of the side walk around the Ground Storage Tank Modify the AC ductwork, fire sprinkler piping, light fixture layout in the MEP space in the Operations Building CHANGE ORDER 20084.00 8 May 2008 (CW00930.DOC) E~ Increase the Contract Price to reflect additional costs associated with the following project modifications: i= Install conduits for the future site security system Y Revise an AC unit in the Operations Building from 10 ton to 15 ton Modify the control system for the Filter air compressors Modify the installation location of the 30-inch influent force main piping y Modify the Operations Building exterior doors - Modify the Operations Building y Modify to the Operations Building lockers Install gutters on the Operations Building y Modify the Clarifier No.1 and No.2 Clarifier effluent piping - Modify the monitoring system for the generator day tank - Modify the routing of the electrical conduits at the existing Chemical Building Modify the VFD enclosures to be installed in the existing Operations Building r Provide coating for the Scum box Enclosed/Attached: Summary table and contractor's proposals. The changes result in the following adjustment of the Contract Price and Contract Time: Contract Price Prior to this Change Order: Net ire-ase (Decrease) Resulting from this Change Order: Current Contract Price Including this Change Order: Completion Prior to this Change Order: Net Increase (Decrease) Resulting from this Change Order -Calendar Days: Completion Date Resulting from this Change Order: $13,431,638 $2 228 $13,429,410 460-days/580-days 0-days No Change CHANGE ORDER 20084.00 8 May 2008 (CW00930.DOC) ECnn! The above changes are approved: ENGINEERING DEPARTMENT The above changes are accepted: By: Tamara Richardson, PE Title: Director of Engineering and Utilities Date: ~ -Z. ~" "`~ ~ CONTRACTOR - Encore Construction C pany Bv: TzM ~N~ER Title: uP ~f C~PeR~-rso~S Date: 5/ $'~ `d The above changes are accepted: CITY OF CLERMONT -~ ~ f ~f~,~~%7 Title ~~'1~ ~ ~' -1 Date: ~ ~ Z ~ ~ Y CHANGE ORDER 20084.00 8 May 2008 (CW00930.DOC) E~ N N ~ ~ Q O N ~ `~ G a ~' ~ o ~ ~ N N=' p ~ ~~ ~ ~ ~ ~ ~ N ~ O . N O v ~ tS~ (/1 ~ ~ t6 O O 'Q N ~ N ~ Q ~ . ft5 .~ ~ 't'b ~ ~ .;~ ~ p ~ O t4 ~ N ~ ~ O U ~U O N~ C -/ ld U¢ N S O N .p N U ~ N ~ _T 7i ~ n- ~ c~ ..- ~ ~ N ~ (p4 _ ~ O Q O ~ ~ O y=- y N 47 Q U N ~ N ~ `` N ~ O L = ~ U tV4 O ~ ~ ~ ~ U ~ v p v- ~ O O Q d ~. O ~~ U X ~ ~~ 0 0 to ~ ~ Q O t4 O G U ~ N U~ .,.. O ~ 7 0 V D U "p ~.~ N +~ Q- U "o ~ U N N '~ ~ t6 ~ ~ p'~ N ~ ~ ~ tO (~ tf7 c6 G G tt5 OS N Q. ~ p ~ S2 +-~ N O ~ U V :O Q, ~ '6 C?- CS~'p N V ~ N N~ ~ 't3 O Q- -CS 'a C N 'a N N Q O~ ~ L O~ N~ N~ O 47 7 Q O 7 tll ~~ O (ll O +- O ~ N Q. ~ V A N ~ .~' N cry ~ N ~ Q "O OL ~ ~ U tUb ~' cU+6 ~ ~ ~ ~ S'G ~ ca ~ U O "' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ V ~ t4 N 5..- . ~ 4? ~- -g o °' Q Ny O ~ ~ O ~ G t1- ~ ~ N 7 v ~ m o, ~ ~ .~ o o ~ ~ v cn r . _ -' o ~ o o U CO Sa- N U O N ~ to ~ ~ ~ Q- ~' V U d ~ ~ V N ~~ .w O ~ N ~ d ~ ~ ~ Z ~ oi- I ~ ~ U ---- O r y O d N ~ q> co V ~ v ~ ~ O v~o~ ~ m V '~ O U 0 U y d M O N y ~n C.,U O o. .~ N d Q1 d m c ~ O Z o Z ~ Z r ~ G N r ~ ~ ~ r o ~ .r' ~ O c ~ -~ N a~ 1.~ y -0 0 o ~ ~ o °~ U .~ N ~' ~ ~ ~ N ~ ~ °~ ~ D o- ~ o ~ c ~ `- ~ ` o_ v ~ ~ ~~ ~ ~ V T U ~ ~ 'C3 O U ~ ~ ~ 'CS y N p ~ IJ- ~ N ca m G~ O M v 0 0 'N m cu '~ N ~ "= N ~ ~ ~ ~ c6 ~ O ~ o WU <r V p ~ ~ ~ z d = o ° a Z Z Z o °a °• o ti ~ ~ ~ ~ ~ ~ ..~ o Z Z O Z d' 1 Q C`7 6~ O d 0 ~- c o ° ~ "~ a '~ o N M ~ M ~ ~ ~ ,.i ~ ~ ~, a- ~ ~ ~ ~ o O rnG ~ tS~ U ~ O 'O . ~ = ~- C`fl ~ fl- L o ° a N ~ ~ .r ~ ~ ,.n Q. ~ ~ o- o ~ o tU ca ~ rn ~ ~ o fl- ~ ~ O 'r' y ~ cv ~ U 4- p ~ .., <- -.- a~ s 0 o c~ o o ~?- c_ y tom- s~ o'~,. ~o o.Q ~.~ .4 ~ .,.~ N N ~ ~ c ~, a, ~ o ~ ~ ~ ~ s ~ p mo m~ r° ~N ~~~ '-o -o u~ y~7° mT ~° °o _~ N N c is 7 a ~ o- ~ ~- ~ N~ ~ LL Q~ N ~' N~ 0 0 ' f?' ~ ~ ~ ,~? (06 -CS ~ c4 Q N U V C U N O N ~'t5 T3 O OV ~ ~ ~ ~ ~ ~ ~ ~ Q O ~ ~ ~ ~ ~ O ~ ~ ~ ~ t6 .~ ~ U +- G J a~ ~ ~ N ~ 4. c a. ' ~ -~ o ~ o M ~ M ,~' N ~ rn ~ cfJ ~ ~ CJ U.- M ~ W ~ U O Q3 ~ ~ ~ w O ~ ~ ' ~ Sl O ~ O 3 ~ M U ~ N ~ N ~ O O ,~ a-% ~ Q N O ~ 0 0 0 0 ->3 ~ ~ ~ . m~ ' ~- ~ ' a~ ~~ coa ~~~~ o a, ~ cu ~ - ~~3 ~ o a c ~ ~ ,~ ~ ~ U ~ ' Y ~ s aNi om o ~ a. ~ mo 0 0 ~~ ~ -a N k- U O ~ ~ ~ p v- ~.. Q ~ O UI ~ ~ ~ °' °' ~ °' o ~ o ~ N ~ ~. ~ ~~ ~ Y O ~ O 'ts C to ° ~ Q ~ O ~ O ~ O .y o ~ o cS7 ~ U? ~ ~ -a ~ O to v V ~ ~ U t4 -~ C V R5 _ O 'O O U N O N ~i C ' 7 tR ~ (6 1`~- ~ O O ~ ~ ~~ ~ U ~ ~ N ~ ~ ~ N (4 ~ v N o o~ ~ o~ rna. ~~ ~ ~ s rn~ ~ cu u - ~ ~ rs ~ rn o, U V -rs o .~ ' N N U N~ (~ O O" d. N T N c~ o ~ c ~ N~ Y O s a~ o ~- ~ ~~ ~° ~ ~ ~ ~ a~ > .. ° a~ o ~ ~ m U o - ~ O~ ~ O `- U ~ N O ~ U O 7 7 N ~ 7 ~ °~ G fl- ~ ~ m ~ Q. ~ ° ~ ° D O O L RS ~~ ~ O O -a O V o ° o o ~ rn U N v ~~ ~ N t6 N C C6 'd (L4 ~i ~ N O N CL6 '(} ~ U C ~ O O ~ Q. ~ C V ~ +~' " +ti.' ~ ~ N G O O "C3 O ~ N ~ U ~ 'n ~ p~~ U~ U~ Ua-U~ V p_ U N U ~ w d d ~ N ~ co N ~ G ~ I f'^ L ~ !~ Q O ~ r d N y ~ O ~ ~ ~• ~ ~ t C ~ `, U ~ , i ~ N ~ V Q •- ~ ~'" • ~ V M ~ ~ fi? ~~/ •~/ O bD v v-+ O c~d C/1 d M 0 0 oA r U G O Q. V N d d ~' vo az N O U N C 0 v .o U ~ ° = o m ~' _ ~ o O o Z Z Z ~ ~ 0 0 Z Z Z ~ Z Z O _ O ^~ d Q ^~ ~ ~ Q ~ ~ ~" ~ 0 Q ~ ~ N O r a N M eY 6H ~ ~ ~ ~ ~ ' Q nY, W X L 11.1 ,,,. CSI ~ L o o ~_ ~ ~ ~ O N N ~ '.` = ~ (0 O U U O O ~ U c _ U _ ~ -°o ~ ~ O O 0 U t~ O L ~ O ~ O ~G` U J ~ ~ ~ ~ O ~ ~ ~ U o ~.o.. to ~ ~ 'C G ~ ~I m ~ ~ ° _ '~ m ~ (~ ,~ ~p (d UI O O N {- O O _ C ~ p (n O (n N ~ O .~ ~ ~ w~ ~ ~ ~. ~ p N ~r N N ~ ~ ~ N U ~ o ~ J ~ ~ C = m m U N N C G p O U ~ ~ c~ ,~ ~ Q a °' w ~' o ~ o _ N ININ O cr'i 0 V 0^ l~ ~M l' O O U W EGA -- ~ ti 0 o ~ c o ,~ o ~ ~ ~9 O ~ _ ~ O U C.N ~L g Q G 1~ N ~ ~ ~'- ~ ~ '1 . N U N 7i Q t0 '~ ~ O N G O ~ ~ G O U ~ ' O G c0 ' O Zi r ~^ O O- ~} O t- Y a'' O 0 - °' o ~.° ° ~ s ~ m U ... ,_ (lS yC (mod O -d 'd ~ ~ U .N N ~ ~ ~ ~ U O (6 7 to ~ N ~ 1 O L5~ T 0 0 N ~ Q o~ ~.~ `~ U N 4 7 ,,_ i ~X ~ M t ~ N ~ ~ O - G 7i ~ .j N O N '~ ~ ~~ N N N O •~ N ~ O ~ G ~ ~ O ~ U ~~ N O~ G~ O N M ./ _v O G +~ 0 00 ~~ c~~ ~ ~~ i7 ~G °~ ~W ~ -° N O N ,Q ~~ ~ X N O N f3- G ,~ N O ~ ~- U) ~. O V ~ ..- ~ G ~ ~ ~ ~ O ~ ~ O ~ v d G O Z Z Z Z cNa d ~ ~ ~ Z ` U .~ O ~. d V O O O ~ 'r ~ O m ~ d cfl ~ N M p N N ~ ~ 0~0 0 ~ ~ ~ ~ G d v= a s ~ ~ ~ c O ~ ~ ~ ~ ~ rn ~ _ G ~ 0 oA G a~ ~ '~ (~ "- ~ U U~ Q N O ~ ~ O s ~' C ~ ~ ~ ~ t6 ~ N ~ U Q. r O ~ 'd N r/1 C) ',~ O M ,~ ~ '~ C3 tlS 'L ~ N O a ~ ~ ~~ o N _ O G v. .,, uG'' U ~ O tT6 N~ Q O ~ O O ~ 'l + N r N U~ O Cd ~ ~ N O ~N :U ~ G O p W b- 'a O -Q ~ rZ U E ~r ' Q y- .. i"- cA ~ ~ Q r ~ Memo To: Wayne Saunders, City Manager From: Tamara Richardson, PE, City Engineer CC: Date: May 16, 2008 Re: Encore Construction East Water Reclamation Facility Change Order No. 3 The East Water Reclamation Facility Expansion, Phase 2 project was awarded to Encore Construction for a total contract price of $16,605,000.00. During the early phase of construction, the City opted to direct purchase many of the larger pieces of equipment to save the sales tax. Also, the contractor, the engineering design firm (Boyle Engineering) and the City reviewed the plans for value engineering (VE) items to reduce the price of the construction. Change Orders 1 and 2 resulted in a contract reduction of $2,948,408.00, reducing the contract to $13,431,638.00. Attached Change Order No. 3 is a group of modifications to the project which include additions and deletions based on operational considerations. The resulting change order is a credit of $2,228.00. The original contract for the project was $16,605,000.00. Change Order Numbers 1 and 2 reduced the contract price to $13,431,638. Change Order Number 3 further reduces the contract price to $13,429,410.00. We request approval of Change Order Number 3 for the EWRF for a credit of $2,228.00.