R-95-871
.
.
.
8
8
CJ1Y OF CLERMONT
RESOLUTION
No. 871
A RESOLUTION OF THE CI1Y COUNCIL OF THE CI1Y OF CLERMONT, LAKE
COUN1Y, FLORIDA GRANTING A CONDITIONAL USE PERMIT TO AMEND
RESOLUTION NO. 847 TO REVISE THE LEGAL DESCRIPTION, TO ALLOW mE
TEMPORARY OPERATION OF A BANK FACILI1Y IN AN EXISTING BUILDING
AND TO TEMPORARILY ALLOW MULCH PARKING, LOCATED IN THE R-3-A
RESIDENTIALIPROFESSIONAL DISTRICT.
WHEREAS, the Planning and Zoning Commission of the City of Clermont, Lake
County, Florida at a meeting held September 5, 1995 recommended approval of this
Conditional Use Permit to amend Resolution No. 847 to revise the legal description, to
allow the temporary operation of a bank facility in an existing building and to
temporarily allow mulch parking, in the R-3-A ResidentiallProfessional District at the
following location:
LEGAL DESCRIPTION
Lots 1, 2, 3, 4 and 5, Lakeview Heights Subdivision
The City Council deems it advisable in the interest of the general welfare of the City of
Clermont, Lake County, Florida to grant this Conditional Use Permit;
NOW THEREFORE BE IT RESOLVED by the City Council of the City of
Clermont, Lake County, FIOfida that:
This ijppli~atiopfor a Conqitiønal TJ.se Permit to amend Resolution No. 847 to
revise the legald.escpiption,.to allow the temporary operation of a bank facility in an
existing building and tø ,teJl1porarily allow ll1ulch parking, located in the R-3-A
ResidentiallProfessional 'Qistrictbe granted subject to the following conditions:
1. ThisConditio~al U.s~ permit shall be ~ppro:vedcønditioned upon compliance with
all previous, conditions speçifi~qin Resolutio~ No. 814 and No. 847 with the exception of
time framesÆorcønstruc.ÍÏOrl;.as' qelineated in this Conditional Use Permit.
2. The bank facility shall ;be-.permitted, one (1) freestanding or one (1) wall sign in
conformance with'signregu)ations~pecifiéd for the ,R-3-A zoning district.
3. The permanent bank facility shall secure all necessary permits and commence
"Substantial Construction Work" within nine (9) months from the date of grant by the
City Council. "Substantial construction work" means the commencement and continuous
prosecution of construction of required improvements ultimately finalized at completion.
.
.
.
"
8
G1Y OF CLERMONT
RESOLUTION
No. 871
Page - 2 -
4. This Conditional Use Permit shall expire eighteen (18) months from the date of
formal grant by the City Council.
5. The temporary bank facility shall commence operation within six (6) months from
the formal date of grant by the City Council otherwise this Conditional Use Permit shall
become null and void.
6. If it is determined that the mulch parking has become problematic or is not
properly maintained in accordance with City Code the Conditional Use Permit will be
brought before the City Council for formal action.
7. The structure shall be inspected by the County Building Official and all building
standards for use as a temporary bank facility shall be provided prior to a certificate of
occupan~ being issued.
8. The structure shall be inspected by the Fire Marshall for life safety requirements
and all standards for use as a temporary bank facility shall be provided prior to a
certificate of occupancy being issued.
9. If in the future, the g~nerationof refuse and trash exceeds normal residential
container amounts a dumpster with standard required enclosure shall be installed.
10. All lighting for the proposed facility shall be designed and located such that light
and/or glare shall be directed \lpon the subject property only.
11. The final. certificate ofoçcupançy for the temporary bank facility shall not be
issued until each of the stated conditions have been met.
12. If any of the staled conditions .are violated, the applicant understands and agrees
the City Council may revoke this Conditional Use Permit by Resolution.
DONE AND RESOLVED-BY THE CITY COUNCIL OF THE CITY OF
CLERMONT, LAKE COUNTY, FLORIDA THIS 26TH DAY OF SEPTEMBER,
1995.
~p~
ROBERT A POOL, Mayor -
ATTEST:
~
LE, City Clerk