Loading...
2009-01 GatorSktch architects, incorporated January 6, 2009 Mr. Wpyne Saunders, City Manager City of Clermont PO Box 120219 Clermont, FL 34712-0219 RE: PROPOSAL FOR ARCHITECTURAL SERVICES Schematic Design Service for the Waterfront Pavilion Dear Mr. Saunders, Thank you for the opportunity to work with you and your staff on this project. Based on our meeting with you and Darren Gray, I am pleased to offer this proposal for your approval: SCOPE OF SERVICES GatorSktch Architects shall hold programming meetings with key city staff in order to generate a documented program for the Waterfront Pavilion, possible renovation of the existing Highlander Hut building, and the site immediately around these two proposed buildings. GatorSktch Architects will use this approved program to develop Schematic Design documents as deliverables. These documents will include a schematic floor plan, schematic elevations and site plan for the above scope. The schematic documents will become part of the design build bid documents in order to create a specific bidding scope. We will be working with a construction budget of $750,000.00 dollars per our meeting. SERVICES: A. Programming: At this very early stage in developing the project, the architect begins with researching all the applicable building & zoning codes imposed by the governing bodies /agencies, and the site and environmental conditions. In order to know what will guide the design, the "rules" need to be explored and fully defined. We will host a number of programming meetings with key staff as well as community members. 723 W. Montrose Street • Clermont, FL 34711 • 352.242.0129 office • 352.394.4827 fax www. gatorsktcharchitects. com Registered Architects: AA-26000515 Page 2 6. Schematic Design Documentation• 1. After the programming has been performed, data prepared, thoroughly discussed, and examined by the design team and the owner, the project enters the Schematic Design Phase. The Architect starts with rough diagrams of programmed spaces, functions, and pedestrian circulation, and to define the amount of area that could be accommodated on the site by each of the proposed functions. Project design at this level is for establishing design concept and scope only. 2. Sketch plans are then prepared, showing the general arrangement of areas, defining the floor plan and how the functions on that floor relate to the pedestrian circulation. The floor plan is designed in preliminary form, to define specific areas and to further define the project scope. During this phase, the Architect is using rolls of sketch paper and is revising and refining sketches until one or more solutions are developed which meet the needs of the project. The Architect will prepare up to three (3) schematic submittals for your review and approval. 3. The schematic drawings usually include small scale drawings of the floor plan, exterior elevations, Interior elevations and immediate site plan. 4. Deliverables submitted to the City shall be included in the bid documents for the Design /Build phase as they see fit. Water Front Pavilion: GatorSktch Architects will develop a schematic floor plan and elevation of the proposed pavilion, based on the approved project program. This will include the input of our Acoustical Engineer to accommodate the pavilion's possible future functions requiring sound equipment and the effects of the sound from those venues on the surrounding residential community. The pavilion will include a performance stage, storage, seating for 350 people in chairs, and a rest room facility. Highlander Hut: GatorSktch Architects will use the approved program to develop a schematic floor plan and elevation for the possible renovation of this building. This renovation will include an exterior facade to match the existing City of Clermont water front architectural style, bring bathrooms to current ADA standards, bring all life safety issues up to current code, include the kitchen area remodel, mechanical system upgrade and the possible addition of a small office intended to be used by community groups hosting events in this building. Page 3 Water Front Park: GatorSktch Architects will use the approved program to develop a schematic site plan for the immediate area around the Water front pavilion and Highlander Hut which will coordinate possible pedestrian walk ways, delivery access to this area, coordination of proposed park site lighting being provided under another contract with future sound / PA system housed in Highlander Hut. This will include the input from our consultant Acoustical Engineer to accommodate the sound / PA system to serve this area of the Water Front Park. The sound from those venues and the impact on the surrounding residential community shall be considered. DESIGN DEVELOPMENT AND DOCUMENTATION: Future selected Design /Build Team -not part of this contract CONSTRUCTION DOCUMENTATION PREPARATION: Future selected Design /Build Team -not part of this contract Permittina• Future selected Design /Build Team -not part of this contract CONTRACT ADMINISTRATION SERVICES: Future selected Design /Build Team -not part of this contract SCHEDULE OF SERVICES Architectural and Engineerina Basic Services• Research and Evaluation 1 weeks Programming 1 weeks Schematic Design Development 3 weeks Total Project Time 5 weeks Above schedu/e of services does not inc/ude or a//ow for approval times required by /oca/ authorities having jurisdiction, or time required for phasing of construction. Page 4 BASIS OF COMPENSATION Basic Services: The basis for compensation is a stipulated sum, based on the scope of work defined herein and based upon an average degree of design and construction quality required by the Owner. Architectural and Engineering Services• A. Programming & Schematic Design $ 15 500.00 Total -Architectural and Engineering Services $ 15,500.00 Supplemental Services• Hourly Rates for Additional Services• (with written prior approval from Owner) A. B. Principal Architect Project Architect $ 150.00 per hour C. Administrative/Field Architect $ $ 120.00 per hour 110.00 per hour D. E Design Architect $ 85.00 per hour . F. Technical Drafting Clerical Time $ 65.00 per hour G. Graphic Computer Time $ $ 50.00 per hour 50.00 per hour REIMBURSABLE EXPENSES: Overnight Deliveries $ at cost Courier Services $ at cost Mileage Postage $ .50 /mile $ at cost Any other Out-of Pocket expenses required for this project at cost .with prior written approval by the owner. Page 5 QUALIFICATIONS Fees quoted herein are presented with the following qualifications: 1. Sales tax on professional services, if imposed by Florida state authorities, shall be in addition to the professional fees stated herein. 2. This proposal includes the services of architects, and acoustical engineers Your concurrence and return of this Agreement for Professional Services will constitute a contract between us and also serve as a "Notice to Proceed." We value your business and look forward to a very successful project. Please contact us if you have any questions. Sincerely, Michael Latham V.P. of Operations APPROVED: Aut orized Signature Date 2/10/2009 For the City of Clermont Print Name: Harold S. Turville, Mayor Title