Loading...
2010-82 )(. ; ;, ` a �7 i t ._._, " L3 .1 4. t - 4_7 1 � a _.''- e. . _ -. e ' ti -,,13 ,,¢fs Y 116 W.Center Street • PO Box 38 phone (352)394-5993 Date 7/9/2009 Minneola,FL 34755 fax (352)394-8456 Project no. 081010.0000 Change Order #2 Proposal Submitted To: Job Name. City of Clermont Clermont Drainage We hereby submit specifications and estimates fox: East Ave.Piping Structure D-9&D-10 i : ('L no 5}„,„..". c,+r;�� Jr a At-L.- 18"FES(Deduct) 1 ea @ $ 1,506.80 /ea I -Crt,r,n) 18" RCP(Deduct) 65 if @ $ 22.60 /1f (1,4-'- OW 24"FES 1 ea © $ 1,608.70 /ea $ 1,608.70 24"RCP 65 If @ $ 31.75 /lf $ 2,063.75 Cut&Tie in Existing Pipe 1 ea @ $ 1,200.00 /ea $ 1,200.00 Core Structure D-10 1 ea © $ 850.00 /ea $ 850.00 Demo 24" RCP 22 if CO $ 11.00 /lf $ 242.00 Temp.Stormwater Diversion Lump Sum $ 1,500.00 14421.6r Sewer Conflect,Structure D-2&D-4 Se wr1 1104 S h.:w-, c...(re ca" "r riv-I S 18" RCP(Deduct) 80 if @ $ 22.60 /1f r , z4)6 Ill 18"FES 1 ea @ $ 1,506.80 /ea $ X1,506.80 Brick Plug 2 ea @ $ 250.00 /ea $ 500.00 Core Structure D4 1 ea @ $ 850.00 /ea $ 850.00 ,p . Subtotal $ 5,537.45 10(/ '�U L Bid Notes: This proposal is subject to acceptance within,N/A days and is void thereafter the opti.• .r�' dersigned: Authorized Signature: i +� tr4O Acceptance of Proposa The above prices d co 'lions are hereby accepted. You are authorized to do the work as specified. Date: z / O/6 Signature: 11°1_40010t10 .‘.%...i..-ir........ -- /SO' Page 1 of 1