Loading...
2005-24A Secure America, Inc. SCOPE OF SERVICES for City of Clermont Task Order #002 Under the Contract Agreement For Security Consultant Services July 29, 2005 DEVELOP A SCOPE FOR THE DESIGN OFA PHYSICAL PROTECTION SYSTEM (PPS) FOR WATER AND WASTEWATER TREATMENT FACILITIES I. PROJECT DESCRIPTION SECURITY CONSULTANT (A Secure America, Inc.) shall render a scope of security design in concert with the concept of security developed in the Water and Wastewater Vulnerability Assessments that will make it possible to determine the level of the consulting effort necessary to design a PPS. The SECURITY CONSULTANT shall develop countermeasures (a PPS) to address deficiencies identified in the Vulnerability Assessment. Activities will include planning upgrades to detection, delay, and response systems. CRITICAL SYSTEM COMPONENTS East Side .West Side • Hancock • Seminole Well • Greater Hills 2 -Well • 4th Street Well • Elevated Tank 1 and Well #4 • Grand Highway Well • East Water Reclamation Facility • Elevated Tank 500,000 Gallon • Sunburst Lane Water Treatment • Elevated'Tank 100,000 Gallon Plant • Greater Hills 1 WTP 1 of 3 A Secure America, Inc. II. SCOPE OF SERVICES July 29, 2005 The SECURITY CONSULTANT shall design and implement a PPS for the OWNER that shall include the following six tasks: 1. Preliminary Design 2. Meetings The following tasks have been identified by the SECURITY CONSULTANT based on experience in designing and implementing security systems for other utilities. TASK 1: WORKSHOP -PRELIMINARY DESIGN 1.1. ASA will utilize the recently completed Vulnerability Assessment (VA) to document specific existing security system vulnerabilities and rank them according to the facility priority rankings given in the report. 12. With OWNER's staff, ASA will review the recommendations for security improvements and the available security mitigation technologies. 1.3. ASA and OWNER will evaluate the existing security measures in place (fences, cameras, access control, lighting, etc.) and determine how they can be incorporated into the upgraded system. This will enable OWNER to utilize existing security measures as far as practical, to minimize future capital costs. 1.4. ASA will provide recommendations for specific security enhancements to lower the risk of attack at all OWNER facilities. The recommendations will include specific equipment descriptions and cost estimates for their purchase and installation. This will enable OWNER to properly plan and budget for security enhancements over time. 1.5. After establishing a mitigation design approach, ASA will establish a schedule for implementing these improvements. 1.6. The results of the workshop will be incorporated into a technical memorandum and submitted for OWNER'S review. III. MEETINGS The SECURITY CONSULTANT shall meet with the OWNER to gather information and present results. Seven meetings are scheduled: 1. Preliminary Design Workshop Meeting -used to plan the Physical Protection System (PPS) project design process with OWNER's staff. 2. Technical Memorandum Presentation Meeting -used to review Task 1 document. IV. DELIVERABLES The SECURITY CONSULTANT shall develop and provide to the OWNER document including: • Technical memorandum depicting the results of the workshop. 2of3 A Secure America, Inc. July 29, 2005 V. TIME OF PERFORMANCE Services described herein shall begin within two to three weeks from the date of notice to proceed (NTP). VI. COMPENSATION Document Amount Task Group 1 -Workshop and Resulting Technical Memorandum 2,750 CHARLES L. BUTLER, JR., MPA, SSEM President ?-aa^ aoos Harold S. Turville, Mayor City of Clermont 3 of 3